11 files, instant download, $67 once
Homeowner Playbooks

Guides for planning a kitchen and bath remodel

Written the same way the kit is written: one question at the top, the figure that answers it, and the published document that figure came from. 66 documents from 39 publishers sit behind these pages, and all of them are listed with links.

General planning information, not professional advice. A figure from a model code is labeled as such and has to be verified where you live.

Sequence and lead times

What has to be decided before what, and how early.

Kitchen planning

Clearances, landing areas, ventilation and the cabinet order.

How to read an appliance spec sheet without missing the number that matters

A spec sheet is written for the installer, not the buyer. Overall size against cutout size, counter depth against finished depth, and the depth with the doors open that collides with the aisle.

The thirteen fields that get missed on a cabinet order

A cabinet order goes wrong in a field, not in a dimension. The thirteen boxes that get left blank, what arrives when they do, and how to check an order against the drawing line by line.

What happens on countertop template day, and what to settle before it

A fabricator measures the installed cabinets and leaves with the drawing your top is cut from. What has to be true before they arrive, what gets decided on the day, and what you are signing.

How much space do you need between kitchen counters

Published planning guidelines put a work aisle at 42 inches for one cook and 48 for more than one, and a walkway at 36. They are different numbers, and measured between finished faces.

How much counter space you need beside the sink, the range and the refrigerator

Published planning guidelines give a counter figure for every appliance in a kitchen: 24 and 18 inches at the sink, 12 and 15 beside the cooking surface, 15 at the refrigerator. Here they are, with the rules that decide what counts.

What size range hood do you need over a 30 inch range

Airflow is only half of it. One manufacturer counts a 90 degree elbow as 15 equivalent feet against a 150 equivalent foot limit for its own hoods, which is why the duct route decides whether a hood works.

Bathroom planning

Fixture clearances, rough in heights, ventilation and the walls.

Hiring and contracts

Checking a contractor, comparing quotes, deposits and change orders.

Change orders and allowances, and where a remodel quietly goes over

A change order is a written record of work added or removed, with what it cost and how many days it added. Allowances are the other way a total moves without anybody doing anything wrong.

How to check a contractor before you spend an hour on the phone

The public register comes first, and it is not called the same thing in every state. What three state authorities publish about their own registers, what to ask for before the meeting, and the reference call in order.

Why three contractor quotes for the same job never match

Three quotes usually differ because they priced different work, not because one business is cheaper. How to read them against one list of lines, count what is missing, and total the allowances.

Your contractor wants 50 percent up front. Here is how to think about it

What a large deposit does and does not tell you, what one state licensing board publishes about down payments, and the one number that shows whether your payments have run ahead of the work.

The final walkthrough, as a method

A walkthrough done by wandering finds what you happen to look at. Raking light, a level, a tape and a camera, room by room in a fixed order, and the records to collect while everybody is still on site.

What a scope of work for a kitchen and bath remodel should contain

A scope of work is the one description of the job that every bidder prices, unchanged. The sections it needs, the supply and install table that decides most of it, and why the allowances are set by you.

The kit behind the guides

These pages answer one question at a time. The Remodel Decision Kit is the same material in the order the decisions actually have to be made: 11 files, about 214 pages, 28 dimensioned drawings and 647 fields you can fill in.

See what is inside